Friday, 24 March, 2023
GM aims to build "coast-to-coast" network of 2,000 EV chargers

<p>A "coast-to-coast" network of quick EV chargers, operated by EVgo and located at Pilot and Flying J truck stops, has been unveiled by General Motors. According to GM and Pilot Company, the new network will have 2,000 DC fast chargers with a 350kW maximum speed placed at up to 500 truck stops and travel hubs. The charging stations will be constructed beside US roads specifically to accommodate long-haul trucks and road-trippers.</p>
Read full story at PR Newswire
Tags: